CCO at Port of Grenaa A/S, Theis Gisselbæk expresses great enthusiasm that Port of Grenaa and partners were given the opportunity to handle this very special task, which was only a possibility due to the large water depth and good sailing conditions available in Grenaa.
It is a rare, special and major operation to handle such a task. "That's why we've also produced some impressive footage of the loading and unloading, which we'd like to share with the industry."
With a length of 206.3 metres and a width of 43 metres, Audax is the largest vessel to have called at the port of Grenaa. This heavy-module carrier was built in 2016 and is of the Arctic ship type. It is built to operate below polar class 3, which is the highest ice class for a civil/commercial ship.
Through an optimal supplier network and with a unique port infrastructure, we can offer outstanding facilities, shore power, multidisciplinary excellence and professional handling of all stacking tasks. Contact CCO Theis Gisselbæk for further dialogue.
+45 87 58 76 00
24-hour service - maritime
Port of Grenaa
Havnecentervej 1
Dk-8500 Grenaa
CVR: 25137736