Our professional crews have extensive experience in everything from twin-lift to ship-to-ship (STS) operations, and are thus available for the efficient and safe handling of a wide variety of tasks. Port of Grenaa has a large fleet of equipment for any loading or unloading task, whether bulk or project cargo such as wind turbine parts, large elements or steel structures.
Function | Capacity | Boom |
---|---|---|
Lifting capacity | 144 t | 22 m |
Bulk handling | 46 t | 54 m |
Bulk grab | 18,0 m3 | |
Bulk grab | 24,0 m3 | |
Polyp grab | 11,5 m3 | |
Polyp grab | 13,5 m3 |
Function | Capacity | Boom |
---|---|---|
Lifting capacity | 140,0 t | 20 m |
Bulk handling | 51 m | |
Bulk grab | 18,0 m3 | |
Bulk grab | 24,0 m3 | |
Polyp grab | 11,5 m3 | |
Polyp grab | 13,5 m3 |
Function | Capacity | Boom |
---|---|---|
Lifting capacity | 120,0 t | 23 m |
Bulk handling | 48 m | |
Bulk grab | 18,0 m3 | |
Polyp grab | 11,5 m3 | |
Polyp grab | 13,5 m3 |
Function | Capacity | Boom |
---|---|---|
Bulk grab | 8 m3 | 26 m |
Bulk grab | 12 m3 | 26 m |
Polyp grab | 4 m3 | 26 m |
Timber grab | 2,5 m3 | 26 m |
Hook | 15 t | 26 m |
Function | Capacity |
---|---|
Volume | 130 m3 |
Weight | 47 t |
Height | 13 m |
Equipment |
---|
Reach stacker with hook up to 84 t |
Container stacker up to 36 t |
Forklifts up to 42 t |
Conveyor belts |
Wheel loader |
Tractor with sweeper |
Mini loader |
Hoppers |
Belt conveyors |
MAFI trailers with truckmaster up to 80 t |
+45 87 58 76 00
24-hour service - maritime
Port of Grenaa
Havnecentervej 1
Dk-8500 Grenaa
CVR: 25137736