Hesselø Havvindmøllepark
Velkommen til Grenaa Havns nabo i Kattegat
Vattenfall
0,8-1,2 GW
15-22 MW
2032
165,55 km2
20-45 m
Vattenfall
0,8-1,2 GW
15-22 MW
2032
165,55 km2
20-45 m
Vattenfall skal bygge Hesselø
Vattenfall to build Hesselø
Vattenfall Vindkraft A/S er udpeget som vinder af udbuddet om Hesselø Havvind-møllepark i Kattegat nord for Sjælland.
Parken planlægges med en kapacitet på mellem 0,8 og 1,2 GW. Den skal efter planen producere strøm fra 2032 og forventes endeligt idriftsat ved udgangen af samme år.
Grenaa Havn ønsker Vattenfall tillykke med tildelingen og håber, at projektet kan danne grundlag for et tæt og værdiskabende samarbejde.
Vattenfall Vindkraft A/S has been appointed as the winner of the tender for the Hesselø Offshore Wind Farm in the Kattegat north of Zealand.
The park is planned to have a capacity of between 0.8 and 1.2 GW. It is scheduled to produce electricity from 2032 and is expected to be fully operational by the end of the same year.
The Port of Grenaa congratulates Vattenfall on the award and hopes that the project can form the basis for a close and value-creating collaboration.
Fra forundersøgelser til grøn strøm
From preparatory studies to sustainable electricity
Hesselø Havvindmøllepark skal etableres i Kattegat nord for Sjælland og får en kapacitet på mellem 0,8 og 1,2 GW. Vattenfall er udpeget som vinder af udbuddet og skal stå for udviklingen, opførelsen og driften af parken. Havvindmølleparken skal efter planen producere strøm fra 2032 og forventes endeligt idriftsat ved udgangen af samme år.
Med sin strategiske placering i Kattegat, specialiserede faciliteter og erfaring fra blandt andet Anholt Havvind- møllepark står Grenaa Havn klar til dialog med Vattenfall, leverandører og øvrige aktører om et muligt samarbejde.
Det nye udbud blev offentliggjort den 20. november 2025 med budfrist den 20. maj 2026. Energistyrelsen modtog fem bud.
Den 4. august 2026 blev Vattenfall udpeget som vinder med en pris på 542 kr. pr. MWh. Næste skridt er kontraktunderskrift, når den afsluttende kontrol af dokumentation og de udbudsjuridiske formalia er gennemført.
Energinet gennemførte i 2023–2024 forundersøgelser for Hesselø Havvindmøllepark.
Undersøgelserne omfatter blandt andet havbund, vindforhold og miljø i planområdet samt mulige kabelkorridorer på havet og på land. Resultaterne reducerer projektrisikoen og indgår som grundlag for Vattenfalls videre projektering og miljøkonsekvensvurdering.
Planen for Hesselø er miljøvurderet og blev vedtaget af Energistyrelsen den 26. juni 2024. Planen blev opdateret den 18. november 2025.
Det konkrete projekt skal desuden gennemgå en miljøkonsekvensvurdering af både anlæggene på havet og de relevante anlæg på land. Vattenfall skal udarbejde vurderingen, og offentligheden vil blive inddraget gennem nye høringer.
Hesselø Havvindmøllepark skal etableres i Kattegat nord for Sjælland og får en kapacitet på mellem 0,8 og 1,2 GW afhængigt af Vattenfalls endelige projekt.
Planen omfatter havvindmøller, en eller flere offshore transformerplatforme og søkabler samt kabler, højspændingsanlæg og eventuelle netforstærkninger på land. Det konkrete design, herunder møllernes størrelse og antal, fastlægges gennem Vattenfalls videre projektering og myndighedsbehandling.
Hesselø planlægges nettilsluttet ved Hovegård Højspændingsstation.
Tilslutningen omfatter søkabler fra havvindmølleparken, kabler og højspændingsanlæg på land samt eventuelle nødvendige forstærkninger af elnettet. Den endelige løsning fastlægges i den videre projektering og myndighedsbehandling.
The Hesselø Offshore Wind Farm will be established in the Kattegat north of Zealand and will have a capacity of between 0.8 and 1.2 GW. Vattenfall has been selected as the winner of the tender and will be responsible for the development, construction and operation of the farm. The offshore wind farm is planned to produce electricity from 2032 and is expected to be finally commissioned by the end of the same year.
With its strategic location in the Kattegat, specialized facilities and experience from, among other things, the Anholt Offshore Wind Farm, the Port of Grenaa is ready to engage in dialogue with Vattenfall, suppliers and other stakeholders about possible collaboration.
The new tender was published on 20 November 2025 with a bid deadline of 20 May 2026. The Danish Energy Agency received five bids.
On 4 August 2026, Vattenfall was named the winner with a price of DKK 542 per MWh. The next step is contract signature, once the final documentation check and tender formalities have been completed.
Energinet carried out feasibility studies for the Hesselø Offshore Wind Farm in 2023–2024.
The studies include, among other things, seabed, wind conditions and the environment in the planning area, as well as possible cable corridors at sea and on land. The results reduce project risk and form the basis for Vattenfall’s further design and environmental impact assessment.
The plan for Hesselø has been environmentally assessed and was adopted by the Danish Energy Agency on June 26, 2024. The plan was updated on November 18, 2025.
The specific project will also undergo an environmental impact assessment of both the offshore facilities and the relevant onshore facilities. Vattenfall will prepare the assessment, and the public will be involved through new consultations.
Hesselø Offshore Wind Farm will be established in the Kattegat north of Zealand and will have a capacity of between 0.8 and 1.2 GW depending on Vattenfall’s final project.
The plan includes offshore wind turbines, one or more offshore transformer platforms and submarine cables as well as cables, high-voltage installations and any grid reinforcements on land. The specific design, including the size and number of turbines, will be determined through Vattenfall’s further design and regulatory processing.
Hesselø is planned to be connected to the grid at Hovegård High Voltage Station.
The connection includes submarine cables from the offshore wind farm, cables and high-voltage installations on land, as well as any necessary reinforcements of the electricity grid. The final solution will be determined in the further design and regulatory processing.
Faciliteter og kompetencer til hele projektets levetid
Grenaa Havn følger projektets udvikling tæt og står klar til dialog med Vattenfall, leverandører og øvrige samarbejdspartnere.
Med vores strategiske placering i Kattegat, erfaring fra blandt andet Anholt Havvindmøllepark og specialiserede faciliteter kan vi understøtte projektet fra installation og projektlogistik til drift og vedligeholdelse.
Facilities and competencies for the entire project life cycle
The Port of Grenaa is following the project’s development closely and is ready to engage in dialogue with Vattenfall, suppliers and other partners.
With our strategic location in Kattegat, experience from, among other things, Anholt Offshore Wind Farm and specialized facilities, we can support the project from installation and project logistics to operation and maintenance.
01 Projektarealer
Store og fleksible arealer til pre-assembly,
oplagring og effektiv projektlogistik
02 Stærke kajer
Kajarealer med høj bæreevne til store og tunge
havvindkomponenter.
03 Jack-up
Forstærket havnebund og gode besejlingsforhold til installationsfartøjer.
04 O&M-base
Lager-, service-, kontor- og crewfaciliteter placeret tæt på kajen.
05 Grøn energi
Grøn landstrøm og moderne forsynings-infrastruktur til maritime operationer.
06 Døgnservice
Et erfarent lokalt leverandørnetværk og adgang til service døgnet rundt.
01 Project areas
Large and flexible areas for pre-assembly,
storage and efficient project logistics
02 Strong quays
Quay areas with high load-bearing capacity for large and heavy offshore wind components.
03 Jack-up
Reinforced harbor bottom and good navigation conditions for installation vessels.
04 O&M-base
Warehouse, service, office and crew facilities located close to the quay.
05 Sustainable energy
Green shore power and modern supply infrastructure for maritime operations.
06 24-hour service
An experienced local supplier network and access to service around the clock.